Before Human Error
The Process-Safety Teardown Checklist
Forty-eight checks drawn from sixteen investigated disasters. Run them against your own site this week.
Current through Issue 16 · SS El Faro
-
01
Givaudan Sense Colour
The harmless-looking material nobody thought to reactivity-test.
-
02
Formosa Plastics
One bypassable procedure standing in for a real barrier.
-
03
Bayer CropScience
A startup pushed before the unit was ready to run.
-
04
BP Texas City Refinery
A low injury rate mistaken for a healthy process.
-
05
Esso Longford Gas Plant
The people who understood the hazard had been moved off-site.
-
06
DuPont La Porte
Every barrier already gone before the last valve was opened.
-
07
Aghorn Operating
A safety system that lived in one man's memory.
-
08
LyondellBasell La Porte
Two sets of bolts on one valve, and nothing marking which held the process in.
-
09
Bio-Lab Conyers
A correct fix, left in the room the hazard had already moved out of.
-
10
Enbridge Line 6B
An alarm that meant two things, and nobody required to go and look.
-
11
T2 Laboratories
A second reaction nobody had measured, ten degrees above where testing stopped.
-
12
Phillips 66 Pasadena
One valve, two identical fittings, and a handover nobody re-verified.
-
13
Imperial Sugar
A housekeeping fix that sealed a hot bearing into a chamber full of sugar dust.
-
14
Williams Geismar Olefins
A safeguard downgraded two tiers, then installed on half the equipment.
-
15
U.S. Steel Clairton
Occupied rooms sited twenty feet directly above the gas line that failed.
-
16
SS El Faro
A captain steering by a 12-hour-old forecast, on a ship the rules let keep 1975 lifeboats.
Sixteen investigations. Sixteen headlines that blamed an operator.
Not one of them held up.